2 Jan 2019 Meeting Notes
a. WP monitoring
=> to be oncall
=> create API monitoring specific TBIWP
b. Sqitch DB
=> on check by Manoj by utilizing codebuild
c. entapbi + entapar have difficulties for ASG
PIC responsibility : update maintenance window (delegates, request ticket) + verify + guidenya
=> oncall
=> ongoing fixes :
a. reduce PI API call by optimizing
b. Cache business partner result
c. WF definition to be updated onn task timeout
=> masih butuh release freeze
- tvlk-dev PowerUser access:
- request permission for eng-leads
- revoke permission from other engs
=> Radit to initiate
- how do we make sure Indonesian and Singapore-based central devops team are aligned?
- require Indonesian delegates :
- may not be Ican due to no interest
- lebih prefer hire rather than rotate
- to be put on hiring sheet (devops)
- Yussi & Nazmy in discussion on supporting roles to become a sarate team
- central engineering
- DBA no need but we need the skillset so maybe coaching clinic / workshop
- Satrio has created a mocking framework for testing in staging, in case product's services are down
- Assessment will be done in January 2020, will set what is in Oracle and Core team
- Deposit is also to be assessed by Oracle team
- analysis may take a long time
- proper development estimation after analysis is done (rough estimate 3 months excluding analysis)
- DOMO workbench migration :
- release freeze
- EC2 windows
94
- IC T4 will have technical mentoring
- tech talk + hands on
- SG T4 can mentor JKT T3
- Career path to T4 IC to be defined in next meeting
- test together. Oncall to deploy in staging.
- 4 Jan to be deployed to stg and we won't deploy after all streams have finished testing
- PIC from technical : radit
- to be done in each stream
- cannot be done before all is multi account
- due to fargate in tvlk-prod
- ERP flight to be multi repo-ed
- Radit + Ridwan will have tech talk
=> will be routine once per month