TPE Updates - May 2019
Hi everyone, here's our monthly update of TPE team! This summary works to keep every one of us to always be up-to-date with what's happening within the TPE. please remember to keep this info to only the internal team :)
Transport Tech
Flight
- We have successfully launched multi-city feature with 5-max itineraries on both iOS and Android!
- Since the dedicated deployer role has been created, Flight team is going to continue ASG migration.
- Flight engineering team is now split into 2 subdomains
- Demand (led by Chandra)
- Supply (led by Sanjeev)
Ground Transport
- Airport Transport for mWeb interface has been launched.
- We have released the Bus Affiliation to production, while our partner (BRI) is still doing testing in staging.
- The development for Sinar Jaya inventory is done and we are waiting for its UAT (User Acceptance Test)
Accommodation Tech
- Engineering retrospective for Accommodation Epic Sale is available.
- We are ready for 5-6x traffic for Lebaran on all funnels.
- HDemand (TERA legacy service) has been dismantled.
- The team is currently improving the algorithm for Room Mapping project. The goal of this project is to group multiple rooms of the same type with different names.
- iOS search result has been migrated to MVVMI.
B2B Tech
Affiliate
- Pegipegi is live as Flight affiliate
Corporate Travel
- We are building a new B2B platform for corporate partners.
Central Tech
Issuance and Post-Issuance
- General Refund has been launched with Flight. Planning for Ground Transport next.
- 10 out of 13 products have been migrated out of Tripops, left with train, ebill, and cinema.
- Almost all IPI modules (except deprecated ones) have been in a separate repo.
Competitive Intelligence
- The team is able to scrape flight competitor’s price on our own with a much bigger volume at a much faster speed. We do so much better compared to the previous practice with QL2 (the 3rd party).
- We save cost to approximately $272,000/year due to cheaper scraping cost with internal scraper.
Quality and Release Engineering
- Dashboard for hotfixes during release freeze is available.
- Mobile app release will happen after lebaran release freeze. The following dates are the schedule to our v3.12.0 release:
- Staging: 19 - 27 June
- Release Candidate: 28 June - 1 July
- iOS Submission and Android 20%: 1 July
- iOS Phased Release/ Android 50%: 3 July
- Release: 8 July
That's all
:smile: Please expect more TPE Updates in the future. Have a good day!
:tada: