Supply Merchandising Revamp Sync: Aug 8th 2018

Highlight
Staging is on Thu next week - Aug 9th 2018

Document
Technical Doc
https://docs.google.com/document/d/1RlnqLAEDPJq5hNr_-is1oomNwZtttaTQSgik9B5Pktg/edit
Timeline
https://docs.google.com/spreadsheets/d/1qOQlYpS2n2O8cyu96kYz1xJvrgcDI_7IQIOetEnJlHg/edit#gid=0

Product
tracking [finalizing]
Merchandising [on-going discussion with accom team]
trophy and label from accom team (include tools) [DONE]
hardcoded in Bali for A/B, if A/B result is OK then go with accom
for special design, hardcoded from BE [DONE]
phase 2 A/B test for BALI region
ignore: sort and filter for hardcoded hotel ranking merchandising
A/B test:
variable and variant name (blocking BE) [waiting from data team]
phase 1 [DONE]
phase 2 [on-going]
phase 3 [postpone]
Installment: [on-going copy by Pras]
string: "installment available"
string: "installment non available"
string: "3 x Rp. 1,000,000"
future development (depends on A/B result):
trophy and label
phase 3 A/B testing

Designer
[DONE]

Engineering
BE
design data structure [on-going]
A/B test internal data to FE
label from accom: Instagrammable, Value for Money, Highly Rated, and Great Location [DONE]
mocking staging (FE Testing) [DONE]:
all regions are following https://docs.google.com/spreadsheets/d/1_qDTTvFvhEk-aiIRFbuq8jXhe3z3nx5rGOgPDWUQkvk/edit#gid=0
staging:
trip02 [DONE]
shared-stg [next week]
production [next week]
Blocked:
merchandising info (discussion with accom) [DONE]
A/B variable and data requirements (PIC: Pras) [on-going]
phase 1 [DONE]
phase 2 and phase 3 [on-going]
FE
wiring [on-going]
staging [on-going]
Blocked:
N/A

Tracking
later when A/B test is DONE

Testing
scenario testing [DONE]
staging [on-going]